WBS2U7C05M7J71723 | 2021 BMW M2 COMPETITION
- Iaai
- Lot #: 33390142
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M2, including its full iaai bid history and auction history. This 2021 BMW M2 has been meticulously cataloged to provide you with every detail: VIN WBS2U7C05M7J71723, COMPETITION trim, Gray exterior, and a powerful 3.0L Inline 6-Cylinder M engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS2U7C05M7J71723 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS2U7C05M7J71723 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (SALVAGE-NC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 1 Aug 2022, and verify the mileage of 5,872 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M2 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
5,872 mil
-
Fuel :
Gasoline
-
Color :
Gray
-
Keys :
Key Available
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L Inline 6-Cylinder M
-
Drive line :
Rear Wheel Drive
-
Damage :
Right Rear
-
Auction :
iaai
-
Location :
Charlotte
-
Seller :
State Farm Group Insurance
Similar Vehicles
JTEBU5JR8K5675426 TOYOTA 4RUNNER 2019 No result
-
68,019 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
5YFBURHE6KP882138 TOYOTA COROLLA 2019 No result
-
60,848 mil
-
Unknown
-
Gasoline
-
Front Wheel Drive
JTDL9MFU3N3032161 TOYOTA PRIUS 2022 No result
-
1 mil
-
Unknown
-
Hybrid
-
All-Wheel Drive
W1NTG4EBXLU029313 MERCEDES-BENZ GLA 2020 No result
-
14,430 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
JTMDWRFVXLD541366 TOYOTA RAV4 2020 No result
-
34,694 mil
-
Unknown
-
Hybrid
-
Four Wheel Drive
-
12,968 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive