Seattle

WBS2U7C09M7J54682 | 2021 BMW M2 COMPETITION

  • VIN VIN

    WBS2U7C09M7J54682

  • Model Year Model Year

    2021

  • Total Drove Total Drove

    26,191 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M2, including its full iaai bid history and auction history. This 2021 BMW M2 has been meticulously cataloged to provide you with every detail: VIN WBS2U7C09M7J54682, COMPETITION trim, Blue exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 405HP engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS2U7C09M7J54682 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS2U7C09M7J54682 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Bill Of Sale) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 26,191 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M2 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 26,191 mil
  • Fuel Fuel : Gasoline
  • Color Color : Blue
  • Keys Keys : Key Available
  • Body Type Body Type : Coupe
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 405HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : Left Side SUSPENSION
  • Auction Auction : iaai
  • Location Location : Seattle
  • Seller Seller : State Farm Group Insurance

Similar Vehicles

Auction: iaai
  • 19,092 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 1,752 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 44,119 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • Unknown
  • Other
  • All-Wheel Drive
Auction: iaai
  • 7,071 mil
  • Automatic
  • Hybrid
  • Front Wheel Drive
Auction: iaai
  • Unknown
  • Other
  • All-Wheel Drive