WBS33AY01PFN84679 | 2023 BMW M3 COMPETITION

  • VIN VIN

    WBS33AY01PFN84679

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    1 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M3, including its full iaai bid history and auction history. This 2023 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33AY01PFN84679, COMPETITION trim, Orange exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33AY01PFN84679 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AY01PFN84679 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (-) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 1 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 1 mil
  • Fuel Fuel : Gasoline
  • Color Color : Orange
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 503HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : All Over
  • Auction Auction : iaai

Similar Vehicles

Auction: iaai
  • 54,659 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • Unknown
  • Other
  • All-Wheel Drive
Auction: iaai
  • Automatic
  • Hybrid
  • Front Wheel Drive
Auction: iaai
  • Unknown
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 12,975 mil
  • Unknown
  • Electric
  • All-Wheel Drive
Auction: iaai
  • 11,147 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive