WBS33AY05MFL49911 | 2021 BMW M3 COMPETITION
- Iaai
- Lot #: 43249769
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M3, including its full iaai bid history and auction history. This 2021 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33AY05MFL49911, COMPETITION trim, Gray exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33AY05MFL49911 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AY05MFL49911 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 58,574 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
58,574 mil
-
Fuel :
Gasoline
-
Color :
Gray
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
Rear Wheel Drive
-
Damage :
Theft
-
Auction :
iaai
-
Location :
North Hollywood
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
19XFL2H89SE008972 HONDA CIVIC 2025 No result
-
10,668 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
3TYLB5JN1RT002580 TOYOTA TACOMA 2024 No result
-
56,864 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
JTNKHMBX6M1125888 TOYOTA C-HR 2021 No result
-
61,015 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
42,096 mil
-
Automatic
-
Flexible Fuel
-
Four Wheel Drive
5N1DR3CCXPC219163 NISSAN PATHFINDER 2023 No result
-
41,400 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
5YFS4MCE4MP071841 TOYOTA COROLLA 2021 No result
-
63,145 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive