WBS33AY06MFK84096 | 2021 BMW M3 COMPETITION
- Iaai
- Lot #: 35216043
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M3, including its full iaai bid history and auction history. This 2021 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33AY06MFK84096, COMPETITION trim, Black exterior, and a powerful 3.0L 6-Cylinder TwinPower engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33AY06MFK84096 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AY06MFK84096 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (MV-907A-NY) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 10 Jan 2023, and verify the mileage of 17,023 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
17,023 mil
-
Fuel :
Gasoline
-
Color :
Black
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
3.0L 6-Cylinder TwinPower
-
Drive line :
Rear Wheel Drive
-
Damage :
Front End
-
Auction :
iaai
-
Location :
Long Island
-
Seller :
State Farm Group Insurance
Similar Vehicles
-
38,457 mil
-
Automatic
-
Other
-
All-Wheel Drive
-
44,428 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
35,110 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
13,633 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
18,428 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
15 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive