NM - ALBUQUERQUE

WBS33AY07PFN29346 | 2023 BMW M3 COMPETITION

  • VIN VIN

    WBS33AY07PFN29346

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    32,616 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M3, including its full copart bid history and auction history. This 2023 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33AY07PFN29346, COMPETITION trim, MAROON exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and Rear-wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33AY07PFN29346 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AY07PFN29346 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NM ST) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 32,616 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 32,616 mil
  • Fuel Fuel : GAS
  • Color Color : MAROON
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : Rear-wheel drive
  • Damage Damage : FRONT END
  • Auction Auction : copart
  • Location Location : NM - ALBUQUERQUE

Similar Vehicles

Auction: copart
  • 65,749 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 9,256 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 13,965 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 57,335 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 46,472 mil
  • AUTOMATIC
  • GAS
  • Rear-wheel drive
Auction: copart
  • 25,021 mil
  • AUTOMATIC
  • ELECTRIC
  • Rear-wheel drive