CA - LONG BEACH

WBS33AY07RFS83644 | 2024 BMW M3

  • VIN VIN

    WBS33AY07RFS83644

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    10,168 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33AY07RFS83644, trim, SILVER exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and Rear-wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33AY07RFS83644 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AY07RFS83644 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 10,168 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 10,168 mil
  • Fuel Fuel : GAS
  • Color Color : SILVER
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : Rear-wheel drive
  • Damage Damage : UNDERCARRIAGE SIDE
  • Auction Auction : copart
  • Location Location : CA - LONG BEACH

Similar Vehicles

Auction: copart
  • 35,631 mil
  • AUTOMATIC
  • HYBRID ENGINE
  • Front-wheel Drive
Auction: copart
  • 18,599 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 5,759 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 46,995 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 27,168 mil
  • AUTOMATIC
  • DIESEL
  • 4x4 w/Rear Wheel Drv