WBS33AY0XRFT47126 | 2024 BMW M3 COMPETITION
- Copart
- Lot #: 59207646
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33AY0XRFT47126, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and REAR WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33AY0XRFT47126 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AY0XRFT47126 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 13,931 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
13,931 mil
-
Fuel :
GAS
-
Color :
GRAY
-
Keys :
YES
-
Body Type :
SEDAN
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
REAR WHEEL DRIVE
-
Damage :
FRONT END UNDERCARRIAGE
-
Auction :
copart
-
Location :
CA - VAN NUYS
Similar Vehicles
JTDB4MEE6T3036156 TOYOTA COROLLA 2026 No result
-
12,896 mil
-
AUTOMATIC
-
GAS
-
FRONT WHEEL DRIVE
4S4BTAAC3N3248369 SUBARU LEGACY 2022 No result
-
83,576 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
5J6RT6H83NL051701 HONDA CRV 2022 No result
-
AUTOMATIC
-
ELECTRIC AND GAS HYBRID
-
ALL WHEEL DRIVE
KNDRH4JGXS5426352 KIA SORENTO 2025 No result
-
27,634 mil
-
AUTOMATIC
-
ELECTRIC AND GAS HYBRID
-
FRONT WHEEL DRIVE
1N4BL4CV0NN352901 NISSAN ALTIMA 2022 No result
-
115,112 mil
-
AUTOMATIC
-
GAS
-
FRONT WHEEL DRIVE
JN8AT3AB6MW209635 NISSAN ROGUE 2021 Upcoming
-
104,766 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE