WBS33AZ00MCH48664 | 2021 BMW M4 COMPETITION
- Iaai
- Lot #: 42580960
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M4, including its full iaai bid history and auction history. This 2021 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33AZ00MCH48664, COMPETITION trim, Black exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33AZ00MCH48664 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AZ00MCH48664 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 37,960 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
37,960 mil
-
Fuel :
Gasoline
-
Color :
Black
-
Keys :
Key Available
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
Rear Wheel Drive
-
Damage :
Front End REAR
-
Auction :
iaai
-
Location :
Sacramento
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
1N4AA6CV9MC514712 NISSAN MAXIMA 2021 No result
-
52,700 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
KMHL64JA0PA346379 HYUNDAI SONATA 2023 No result
-
38,811 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
KNDPNCAC9M7896788 KIA SPORTAGE 2021 No result
-
52,284 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
1C4PJXANXSW532595 JEEP WRANGLER 2025 No result
-
817 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
7FARW2H93NE023290 HONDA CR-V 2022 No result
-
40,687 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
3VV4B7AX1RM119879 VOLKSWAGEN TIGUAN 2024 No result
-
14,351 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive