WBS33AZ01MCH03670 | 2021 BMW M4 M4 COMPETI
- Copart
- Lot #: 60575962
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M4, including its full copart bid history and auction history. This 2021 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33AZ01MCH03670, M4 COMPETI trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and Rear-wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33AZ01MCH03670 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AZ01MCH03670 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (PA SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 4 Nov 2022, and verify the mileage of 12,044 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
12,044 mil
-
Fuel :
GAS
-
Color :
GRAY
-
Keys :
YES
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
Rear-wheel drive
-
Damage :
FRONT END SIDE
-
Auction :
copart
Similar Vehicles
-
13,535 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
WBA7U2C0XLGM27432 BMW 7 SERIES 2020 No result
-
1 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
22,890 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
-
64,519 mil
-
AUTOMATIC
-
GAS
-
Rear-wheel drive
-
50,575 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
WA1LHAF7XKD040026 AUDI Q7 2019 Not sold
-
83,955 mil
-
GAS
-
All wheel drive