Raleigh

WBS33AZ08MCG87760 | 2021 BMW M4 COMPETITION

  • VIN VIN

    WBS33AZ08MCG87760

  • Model Year Model Year

    2021

  • Total Drove Total Drove

    18,780 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M4, including its full iaai bid history and auction history. This 2021 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33AZ08MCG87760, COMPETITION trim, Gray exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33AZ08MCG87760 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33AZ08MCG87760 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 4 Apr 2025, and verify the mileage of 18,780 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 18,780 mil
  • Fuel Fuel : Gasoline
  • Color Color : Gray
  • Keys Keys : Key Available
  • Body Type Body Type : Coupe
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 503HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : Left Rear REAR
  • Auction Auction : iaai
  • Location Location : Raleigh
  • Seller Seller : North Carolina Farm Bureau Insurance Group

Similar Vehicles

Auction: iaai
  • 29,704 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 143,189 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 24,867 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 26,181 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 35,761 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 59,613 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive