CA - VAN NUYS

WBS33BA01PCL70972 | 2023 BMW M4 COMPETITION

  • VIN VIN

    WBS33BA01PCL70972

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    17,104 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M4, including its full copart bid history and auction history. This 2023 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33BA01PCL70972, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33BA01PCL70972 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33BA01PCL70972 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 17,104 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 17,104 mil
  • Fuel Fuel : GAS
  • Color Color : GRAY
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : REAR END
  • Auction Auction : copart
  • Location Location : CA - VAN NUYS

Similar Vehicles

Auction: copart
  • 66,192 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 62,318 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 20,175 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 18,803 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 8,842 mil
  • AUTOMATIC
  • ELECTRIC
  • Rear-wheel drive
Auction: copart
  • 15,017 mil
  • AUTOMATIC
  • ELECTRIC
  • All wheel drive