WBS33BA09NCK05569 | 2022 BMW M4 COMPETITION XDRIVE
- Iaai
- Lot #: 40923913
Vehicle Main Features
On this page, you will discover the complete profile of the 2022 BMW M4, including its full iaai bid history and auction history. This 2022 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33BA09NCK05569, COMPETITION XDRIVE trim, Black exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33BA09NCK05569 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33BA09NCK05569 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 13 Feb 2025, and verify the mileage of 33,186 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
33,186 mil
-
Fuel :
Gasoline
-
Color :
Black
-
Body Type :
Convertible
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End SUSPENSION
-
Auction :
iaai
-
Location :
Miami-North
Similar Vehicles
3MW69FF07P8D59756 BMW 330I 2023 No result
-
15,933 mil
-
Automatic
-
Gasoline
-
Rear Wheel Drive
4T1G11AK3NU718977 TOYOTA CAMRY 2022 Not sold
-
14,513 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
61,966 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
30,601 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
61,897 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
58AJZ1B1XRU166638 LEXUS ES 2024 $18,500
-
22,692 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive