Miami-North

WBS33BA09RCR85529 | 2024 BMW M4 COMPETITION XDRIVE

  • VIN VIN

    WBS33BA09RCR85529

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    27,220 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M4, including its full iaai bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33BA09RCR85529, COMPETITION XDRIVE trim, Orange exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33BA09RCR85529 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33BA09RCR85529 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 27,220 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 27,220 mil
  • Fuel Fuel : Gasoline
  • Color Color : Orange
  • Keys Keys : Key Available
  • Body Type Body Type : Convertible
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 503HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Front End Suspension
  • Auction Auction : iaai
  • Location Location : Miami-North

Similar Vehicles

Auction: iaai
  • 54,502 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 24,769 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 98,602 mil
  • Manual
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 29,382 mil
  • Automatic
  • Flexible Fuel
  • Four Wheel Drive
Auction: iaai
  • 39,186 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 25,053 mil
  • Automatic
  • Hybrid
  • All-Wheel Drive