CA - VAN NUYS

WBS33BA0XRCP37547 | 2024 BMW M4 COMPETITION

  • VIN VIN

    WBS33BA0XRCP37547

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    2,059 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M4, including its full copart bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33BA0XRCP37547, COMPETITION trim, BLACK exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33BA0XRCP37547 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33BA0XRCP37547 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 2,059 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 2,059 mil
  • Fuel Fuel : GAS
  • Color Color : BLACK
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : UNDERCARRIAGE FRONT END
  • Auction Auction : copart
  • Location Location : CA - VAN NUYS

Similar Vehicles

Auction: copart
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 75,175 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 33,279 mil
  • AUTOMATIC
  • FLEXIBLE FUEL
  • All wheel drive
Auction: copart
  • 69,999 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 59,108 mil
  • AUTOMATIC
  • GAS
  • Rear-wheel drive