PA - YORK HAVEN

WBS33HJ02SFT95907 | 2025 BMW M3 COMPETITION

  • VIN VIN

    WBS33HJ02SFT95907

  • Model Year Model Year

    2025

  • Total Drove Total Drove

    13,660 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M3, including its full copart bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ02SFT95907, COMPETITION trim, BLUE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HJ02SFT95907 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ02SFT95907 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (PA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 13,660 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 13,660 mil
  • Fuel Fuel : GAS
  • Color Color : BLUE
  • Keys Keys : YES
  • Body Type Body Type : SEDAN
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : FRONT END
  • Auction Auction : copart
  • Location Location : PA - YORK HAVEN

Similar Vehicles

Auction: copart
  • AUTOMATIC
  • GAS
  • 4X4 W/REAR WHEEL DRV
Auction: copart
  • 24,292 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 17,451 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 201,186 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 67,561 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 81,701 mil
  • AUTOMATIC
  • FLEXIBLE
  • 4X4 W/REAR WHEEL DRV