NC - MOCKSVILLE

WBS33HJ02SFU45219 | 2025 BMW M3 COMPETITION

  • VIN VIN

    WBS33HJ02SFU45219

  • Model Year Model Year

    2025

  • Total Drove Total Drove

    160 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M3, including its full copart bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ02SFU45219, COMPETITION trim, PURPLE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HJ02SFU45219 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ02SFU45219 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NC SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 28 Oct 2026, and verify the mileage of 160 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 160 mil
  • Fuel Fuel : GAS
  • Color Color : PURPLE
  • Keys Keys : YES
  • Body Type Body Type : SEDAN
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : FRONT END MECHANICAL
  • Auction Auction : copart
  • Location Location : NC - MOCKSVILLE

Similar Vehicles

Auction: copart
  • 62,026 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 5,873 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • ALL WHEEL DRIVE
Auction: copart
  • 53,757 mil
  • AUTOMATIC
  • GAS
  • 4X4 W/FRONT WHL DRV
Auction: copart
  • 60,501 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • ALL WHEEL DRIVE
Auction: copart
  • 30,783 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 35,134 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • FRONT WHEEL DRIVE