North Hollywood

WBS33HJ03SFU09314 | 2025 BMW M3 COMPETITION XDRIVE

  • VIN VIN

    WBS33HJ03SFU09314

  • Model Year Model Year

    2025

  • Total Drove Total Drove

    1,737 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M3, including its full iaai bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ03SFU09314, COMPETITION XDRIVE trim, White exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 523HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HJ03SFU09314 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ03SFU09314 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 9 Apr 2025, and verify the mileage of 1,737 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 1,737 mil
  • Fuel Fuel : Gasoline
  • Color Color : White
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 523HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Left Front SUSPENSION
  • Auction Auction : iaai
  • Location Location : North Hollywood
  • Seller Seller : State Farm Group Insurance

Similar Vehicles

Auction: iaai
  • 92,775 mil
  • Automatic
  • Gasoline
  • Rear Wheel Drive
Auction: iaai
  • 62,617 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 16,244 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 42,432 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 75,003 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 81,267 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive