CRASHEDTOYS POWERSPORT AUCTION

WBS33HJ04SFT90255 | 2025 BMW M3 COMPETITION

  • VIN VIN

    WBS33HJ04SFT90255

  • Model Year Model Year

    2025

  • Total Drove Total Drove

    10,051 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M3, including its full copart bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ04SFT90255, COMPETITION trim, GREEN exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HJ04SFT90255 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ04SFT90255 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 10,051 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 10,051 mil
  • Fuel Fuel : GAS
  • Color Color : GREEN
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : FRONT END
  • Auction Auction : copart
  • Location Location : CRASHEDTOYS POWERSPORT AUCTION

Similar Vehicles

Auction: copart
  • 111,679 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 38,062 mil
  • AUTOMATIC
  • FLEXIBLE FUEL
  • All wheel drive
Auction: copart
  • 105,924 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 44,101 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 16,024 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 24,337 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive