WBS33HJ04SFV40252 | 2025 BMW M3 COMPETITION
- Copart
- Lot #: 62100226
Vehicle Main Features
On this page, you will discover the complete profile of the 2025 BMW M3, including its full copart bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ04SFV40252, COMPETITION trim, WHITE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33HJ04SFV40252 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ04SFV40252 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 11,901 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
11,901 mil
-
Fuel :
GAS
-
Color :
WHITE
-
Keys :
YES
-
Body Type :
SEDAN
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
ALL WHEEL DRIVE
-
Damage :
ROLLOVER
-
Auction :
copart
-
Location :
CA - SUN VALLEY
Similar Vehicles
5J8YE1H36NL006045 ACURA MDX 2022 No result
-
81,683 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
7SAYGDEF0NF545713 TESLA MODEL Y 2022 Upcoming
-
50,891 mil
-
AUTOMATIC
-
ELECTRIC
-
ALL WHEEL DRIVE
JN8BT3BBXSW154557 NISSAN ROGUE 2025 Not sold
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
2C3CDXBG5NH129301 DODGE CHARGER 2022 Upcoming
-
96,587 mil
-
AUTOMATIC
-
FLEXIBLE
-
REAR WHEEL DRIVE
3TYRX5GN9NT061695 TOYOTA TACOMA 2022 Upcoming
-
58,001 mil
-
AUTOMATIC
-
GAS
-
4X2
3TYRX5GN1NT055860 TOYOTA TACOMA 2022 Upcoming
-
58,571 mil
-
AUTOMATIC
-
GAS
-
4X2