WBS33HJ09SFU28501 | 2025 BMW M3 COMPETITION XDRIVE

  • VIN VIN

    WBS33HJ09SFU28501

  • Model Year Model Year

    2025

  • Total Drove Total Drove

    26,951 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M3, including its full iaai bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ09SFU28501, COMPETITION XDRIVE trim, Gray exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 523HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HJ09SFU28501 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ09SFU28501 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 26,951 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 26,951 mil
  • Fuel Fuel : Gasoline
  • Color Color : Gray
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 523HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Left Front Suspension
  • Auction Auction : iaai
  • Seller Seller : Auto Club of Southern CA (ACSC)

Similar Vehicles

Auction: iaai
  • 42,910 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 45,878 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 1 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 63,014 mil
  • Automatic
  • Electric
  • All-Wheel Drive
Auction: iaai
  • 72 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 94,107 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive