WBS33HJ0XSFT90597 | 2025 BMW M3 COMPETITION
- Copart
- Lot #: 65596505
Vehicle Main Features
On this page, you will discover the complete profile of the 2025 BMW M3, including its full copart bid history and auction history. This 2025 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ0XSFT90597, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33HJ0XSFT90597 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ0XSFT90597 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NJ SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 3,607 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
3,607 mil
-
Fuel :
GAS
-
Color :
GRAY
-
Keys :
YES
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
All wheel drive
-
Damage :
FRONT END REAR END
-
Auction :
copart
-
Location :
NJ - TRENTON
Similar Vehicles
4S3BWAB61M3013780 SUBARU LEGACY 2021 No result
-
92,214 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
AUTOMATIC
-
GAS
-
4x4 w/Rear Wheel Drv
1FMJK1M86REA38624 FORD EXPEDITION 2024 No result
-
14,532 mil
-
GAS
-
4x4 w/Rear Wheel Drv
3MVDMBDY5NM446746 MAZDA CX30 2022 No result
-
AUTOMATIC
-
GAS
-
All wheel drive
3N1AB8DV1PY273406 NISSAN SENTRA 2023 No result
-
26,189 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
5UXCY8C04M9H56319 BMW X6 2021 No result
-
AUTOMATIC
-
GAS
-
All wheel drive