MI - DETROIT

WBS33HK03SCS96674 | 2025 BMW M4 COMPETITION

  • VIN VIN

    WBS33HK03SCS96674

  • Model Year Model Year

    2025

  • Total Drove Total Drove

    15,225 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M4, including its full copart bid history and auction history. This 2025 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33HK03SCS96674, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HK03SCS96674 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HK03SCS96674 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (MI CT) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 25 Sep 2026, and verify the mileage of 15,225 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 15,225 mil
  • Fuel Fuel : GAS
  • Color Color : GRAY
  • Keys Keys : YES
  • Body Type Body Type : COUPE
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : FRONT END MECHANICAL
  • Auction Auction : copart
  • Location Location : MI - DETROIT

Similar Vehicles

Auction: copart
  • 31,552 mil
  • AUTOMATIC
  • GAS
  • 4X4 W/REAR WHEEL DRV
Auction: copart
  • 50,012 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • FRONT WHEEL DRIVE
Auction: copart
  • 9,165 mil
  • AUTOMATIC
  • DIESEL
  • 4X4 W/REAR WHEEL DRV
Auction: copart
  • 98,229 mil
  • AUTOMATIC
  • GAS
  • FOUR BY FOUR
Auction: copart
  • 28,673 mil
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 29,019 mil
  • AUTOMATIC
  • ELECTRIC
  • ALL WHEEL DRIVE