WBS33HK03TCW34625 | 2026 BMW M4 COMPETITION XDRIVE
- Iaai
- Lot #: 46376435
Vehicle Main Features
On this page, you will discover the complete profile of the 2026 BMW M4, including its full iaai bid history and auction history. This 2026 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33HK03TCW34625, COMPETITION XDRIVE trim, Black exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, premium , 523HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33HK03TCW34625 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HK03TCW34625 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 150,037 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
150,037 mil
-
Fuel :
Gasoline
-
Color :
Black
-
Keys :
Key Available
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, premium , 523HP
-
Drive line :
All-Wheel Drive
-
Damage :
Right Front
-
Auction :
iaai
-
Location :
Chicago-North
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
-
4,253 mil
-
Automatic
-
Hybrid
-
All-Wheel Drive
5YFB4MDE2SP302750 TOYOTA COROLLA 2025 No result
-
16,321 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
JTEPU5JR2R6283598 TOYOTA 4RUNNER 2024 No result
-
48,555 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
5YFB4MDE9RP109389 TOYOTA COROLLA 2024 No result
-
83,827 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
3KPF24AD2PE606365 KIA FORTE 2023 No result
-
34,316 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
3CZRZ1H50PM725697 HONDA HR-V 2023 No result
-
47,450 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive