OR - PORTLAND NORTH

WBS33HK08TCV00192 | 2026 BMW M4 COMPETITION

  • VIN VIN

    WBS33HK08TCV00192

  • Model Year Model Year

    2026

  • Total Drove Total Drove

    10,940 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2026 BMW M4, including its full copart bid history and auction history. This 2026 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33HK08TCV00192, COMPETITION trim, WHITE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HK08TCV00192 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HK08TCV00192 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (OR SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 10,940 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 10,940 mil
  • Fuel Fuel : GAS
  • Color Color : WHITE
  • Keys Keys : YES
  • Body Type Body Type : COUPE
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : FRONT END
  • Auction Auction : copart
  • Location Location : OR - PORTLAND NORTH

Similar Vehicles

Auction: copart
  • 23,432 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 122,341 mil
  • AUTOMATIC
  • ELECTRIC
  • ALL WHEEL DRIVE
Auction: copart
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 114,458 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • FRONT WHEEL DRIVE
Auction: copart
  • 3,744 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 34,625 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • FRONT WHEEL DRIVE