Avenel New Jersey

WBS43AY00RFR57783 | 2024 BMW M3 COMPETITION XDRIVE

  • VIN VIN

    WBS43AY00RFR57783

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    6,891 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full iaai bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY00RFR57783, COMPETITION XDRIVE trim, Dark Blue exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 543HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AY00RFR57783 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY00RFR57783 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Clear) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 5 Oct 2026, and verify the mileage of 6,891 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 6,891 mil
  • Fuel Fuel : Gasoline
  • Color Color : Dark Blue
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 543HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Left Front
  • Auction Auction : iaai
  • Location Location : Avenel New Jersey

Similar Vehicles

Auction: iaai
  • 145,438 mil
  • Automatic
  • Hybrid
  • Front Wheel Drive
Auction: iaai
  • 57,658 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 16,375 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 45,943 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 98,655 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 77,362 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive