Long Island

WBS43AY01RFS41331 | 2024 BMW M3 COMPETITION XDRIVE

  • VIN VIN

    WBS43AY01RFS41331

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    40,612 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full iaai bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY01RFS41331, COMPETITION XDRIVE trim, Gray exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 543HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AY01RFS41331 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY01RFS41331 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 40,612 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 40,612 mil
  • Fuel Fuel : Gasoline
  • Color Color : Gray
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 543HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Front & Rear Left & Right Side
  • Auction Auction : iaai
  • Location Location : Long Island
  • Seller Seller : State Farm Group Insurance

Similar Vehicles

Auction: iaai
  • 97,890 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 69,973 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 848 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 45,343 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 1 mil
  • Automatic
  • Electric
  • All-Wheel Drive
Auction: iaai
  • 96,295 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive