NY - NEWBURGH

WBS43AY01RFS49929 | 2024 BMW M3

  • VIN VIN

    WBS43AY01RFS49929

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    25,718 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY01RFS49929, trim, BLUE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AY01RFS49929 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY01RFS49929 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NY SM) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 3 Mar 2026, and verify the mileage of 25,718 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 25,718 mil
  • Fuel Fuel : GAS
  • Color Color : BLUE
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : REAR END UNDERCARRIAGE
  • Auction Auction : copart
  • Location Location : NY - NEWBURGH

Similar Vehicles

Auction: copart
  • 29,602 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 61,323 mil
  • Automatic
  • Gas
  • All Wheel Drive
Auction: copart
  • 55,699 mil
  • AUTOMATIC
  • HYBRID ENGINE
  • Front-wheel Drive
Auction: copart
  • 31,233 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 37,706 mil
  • AUTOMATIC
  • Gas
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 51,807 mil
  • Automatic
  • Gas
  • Front Wheel Drive