WBS43AY02RFS94121 | 2024 BMW M3 COMPETITION XDRIVE
- Iaai
- Lot #: 44703528
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M3, including its full iaai bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY02RFS94121, COMPETITION XDRIVE trim, Black exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 543HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY02RFS94121 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY02RFS94121 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 12,203 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
12,203 mil
-
Fuel :
Gasoline
-
Color :
Black
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 543HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End
-
Auction :
iaai
-
Location :
Cincinnati
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
3KPF54AD7PE620043 KIA FORTE 2023 No result
-
20,418 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
KMHLP4DG3SU888810 HYUNDAI ELANTRA 2025 No result
-
25,234 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
KMHLM4AG5PU619549 HYUNDAI ELANTRA 2023 No result
-
14,094 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
5N1BT3BB4TC723428 NISSAN ROGUE 2026 No result
-
838 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
1FTEW2LP1RKD85126 FORD F-150 2024 No result
-
44,874 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
5XYP2DHC5MG183457 KIA TELLURIDE 2021 No result
-
105,701 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive