WBS43AY03RFT33136 | 2024 BMW M3 COMPETITION XDRIVE
- Iaai
- Lot #: 42945056
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M3, including its full iaai bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY03RFT33136, COMPETITION XDRIVE trim, Teal exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 543HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY03RFT33136 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY03RFT33136 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 8,253 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
8,253 mil
-
Fuel :
Gasoline
-
Color :
Teal
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 543HP
-
Drive line :
All-Wheel Drive
-
Damage :
Flood ALL OVER
-
Auction :
iaai
-
Location :
Fort Myers
-
Seller :
JP Morgan Chase
Similar Vehicles
1FTEX1CB9MKE43133 FORD F-150 2021 No result
-
55,337 mil
-
Automatic
-
Gasoline
58ADZ1B18RU169633 LEXUS ES 350 2024 No result
-
19,248 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
1HGCV1F3XNA012200 HONDA ACCORD 2022 No result
-
48,257 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
1G1ZC5ST2SF138831 CHEVROLET MALIBU 2025 No result
-
14,938 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
1 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
KMHRC8A34RU339108 HYUNDAI VENUE 2024 No result
-
4,985 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive