Los Angeles South

WBS43AY05PFP39755 | 2023 BMW M3 COMPETITION XDRIVE

  • VIN VIN

    WBS43AY05PFP39755

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    9,088 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M3, including its full iaai bid history and auction history. This 2023 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY05PFP39755, COMPETITION XDRIVE trim, Gray exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AY05PFP39755 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY05PFP39755 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 9,088 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 9,088 mil
  • Fuel Fuel : Gasoline
  • Color Color : Gray
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 503HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Front End LEFT & RIGHT SIDE
  • Auction Auction : iaai
  • Location Location : Los Angeles South
  • Seller Seller : Wawanesa General Insurance Company

Similar Vehicles

Auction: iaai
  • 77,067 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 61,366 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 36,477 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 132,389 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 200,613 mil
  • Automatic
  • Hybrid
  • All-Wheel Drive
Auction: iaai
  • 54,578 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive