ONTARIO AUCTION

WBS43AY05RFT40007 | 2024 BMW M3 COMPETITION

  • VIN VIN

    WBS43AY05RFT40007

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    8,200 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY05RFT40007, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AY05RFT40007 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY05RFT40007 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (ON ST) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 25 Feb 2025, and verify the mileage of 8,200 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 8,200 mil
  • Fuel Fuel : GAS
  • Color Color : GRAY
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : FRONT END REAR END
  • Auction Auction : copart
  • Location Location : ONTARIO AUCTION

Similar Vehicles

Auction: copart
  • 7,585 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 37,871 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 15,325 mil
  • AUTOMATIC
  • HYBRID ENGINE
  • Front-wheel Drive
Auction: copart
  • 63,828 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 59,135 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 62,678 mil
  • AUTOMATIC
  • GAS
  • Rear-wheel drive