FL - MIAMI NORTH

WBS43AY06RFS51546 | 2024 BMW M3 COMPETITION

  • VIN VIN

    WBS43AY06RFS51546

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    307 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY06RFS51546, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AY06RFS51546 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY06RFS51546 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (FL RB) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 307 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 307 mil
  • Fuel Fuel : GAS
  • Color Color : GRAY
  • Keys Keys : YES
  • Body Type Body Type : SEDAN
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : REAR END
  • Auction Auction : copart
  • Location Location : FL - MIAMI NORTH

Similar Vehicles

Auction: copart
  • 53,540 mil
  • AUTOMATIC
  • ELECTRIC
  • REAR WHEEL DRIVE
Auction: copart
  • 78,831 mil
  • AUTOMATIC
  • GAS
  • REAR WHEEL DRIVE
Auction: copart
  • 21,680 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 13,599 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • FRONT WHEEL DRIVE
Auction: copart
  • 17,351 mil
  • AUTOMATIC
  • GAS
  • 4X4 W/FRONT WHL DRV
Auction: copart
  • 64,788 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE