WBS43AY07NFL94130 | 2022 BMW M3 M3 COMPETI
- Copart
- Lot #: 61525892
Vehicle Main Features
On this page, you will discover the complete profile of the 2022 BMW M3, including its full copart bid history and auction history. This 2022 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY07NFL94130, M3 COMPETI trim, WHITE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY07NFL94130 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY07NFL94130 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NY SM) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 9 Jan 2023, and verify the mileage of 2,784 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
2,784 mil
-
Fuel :
GAS
-
Color :
WHITE
-
Keys :
YES
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
All wheel drive
-
Damage :
REAR END FRONT END
-
Auction :
copart
Similar Vehicles
-
57,113 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
5UXTR9C51KLE15815 BMW X3 2019 $16,900
-
49,795 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
WA1LHAF77KD025564 AUDI Q7 2019 $21,300
-
37,330 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
40,858 mil
-
AUTOMATIC
-
ELECTRIC
-
All wheel drive
-
7,521 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
20,755 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
Front-wheel Drive