WBS43AY07RFS42807 | 2024 BMW M3 COMPETITION XDRIVE
- Iaai
- Lot #: 41678678
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M3, including its full iaai bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY07RFS42807, COMPETITION XDRIVE trim, White exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 543HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY07RFS42807 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY07RFS42807 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 19 May 2025, and verify the mileage of 3,394 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
3,394 mil
-
Fuel :
Gasoline
-
Color :
White
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 543HP
-
Drive line :
All-Wheel Drive
-
Damage :
Left Front UNDERCARRIAGE
-
Auction :
iaai
-
Location :
Dream Rides
-
Seller :
Geico Insurance
Similar Vehicles
-
13,625 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
21,525 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
-
112,077 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
65,740 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
19XFL1G84RE029704 HONDA CIVIC 2024 No result
-
1 mil
-
Manual
-
Gasoline
-
Front Wheel Drive
3TYSZ5AN4LT005455 TOYOTA TACOMA 2020 No result
-
99,533 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive