WBS43AY09PFN85521 | 2023 BMW M3 COMPETITION
- Copart
- Lot #: 62734685
Vehicle Main Features
On this page, you will discover the complete profile of the 2023 BMW M3, including its full copart bid history and auction history. This 2023 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY09PFN85521, COMPETITION trim, GRAY exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY09PFN85521 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY09PFN85521 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NJ SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 19 Aug 2025, and verify the mileage of 25,968 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
25,968 mil
-
Fuel :
GAS
-
Color :
GRAY
-
Keys :
YES
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
All wheel drive
-
Damage :
FRONT END
-
Auction :
copart
-
Location :
NJ - SOMERVILLE
Similar Vehicles
-
83,610 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
7FARS6H92PE018264 HONDA CRV 2023 $11,400
-
9,908 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
All wheel drive
-
AUTOMATIC
-
GAS
-
All wheel drive
-
44,929 mil
-
AUTOMATIC
-
GAS
-
4x4 w/Rear Wheel Drv
3CZRU6H58NM704802 HONDA HR-V 2022 No result
-
32,272 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
122,078 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive