WBS43AY09PFP04541 | 2023 BMW M3 COMPETITION XDRIVE
- Iaai
- Lot #: 41140882
Vehicle Main Features
On this page, you will discover the complete profile of the 2023 BMW M3, including its full iaai bid history and auction history. This 2023 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY09PFP04541, COMPETITION XDRIVE trim, Red exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY09PFP04541 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY09PFP04541 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 10 Mar 2025, and verify the mileage of 39,330 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
39,330 mil
-
Fuel :
Gasoline
-
Color :
Red
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End LEFT SIDE
-
Auction :
iaai
-
Location :
Fremont
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
5YJ3E1EA4PF513169 TESLA MODEL 3 2023 Not sold
-
9,406 mil
-
Automatic
-
Electric
-
Rear Wheel Drive
5UXCR6C02L9B35905 BMW X5 2020 Not sold
-
82,901 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
7SAYGDEE5NF343506 TESLA MODEL Y 2022 Not sold
-
42,836 mil
-
Automatic
-
Electric
-
All-Wheel Drive
3TYLB5JN4RT023844 TOYOTA TACOMA 2024 Not sold
-
6,554 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
4T1F31AK7NU586683 TOYOTA CAMRY 2022 No result
-
29,133 mil
-
Automatic
-
Hybrid
-
Front Wheel Drive
-
32,494 mil
-
Automatic
-
Hybrid
-
All-Wheel Drive