WBS43AY0XRFS28688 | 2024 BMW M3 COMPETITION
- Copart
- Lot #: 84095814
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS43AY0XRFS28688, COMPETITION trim, TEAL exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AY0XRFS28688 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AY0XRFS28688 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CO ST) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 25 Feb 2025, and verify the mileage of 6,178 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
6,178 mil
-
Fuel :
GAS
-
Color :
TEAL
-
Keys :
YES
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
All wheel drive
-
Damage :
UNDERCARRIAGE MINOR DENT/SCRATCHES
-
Auction :
copart
-
Location :
CO - DENVER
Similar Vehicles
-
31,326 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
JTDKAMFU2M3136187 TOYOTA PRIUS 2021 No result
-
75,661 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
Front-wheel Drive
-
AUTOMATIC
-
HYBRID ENGINE
-
All wheel drive
5YJ3E1EA3MF990803 TESLA MODEL 3 2021 No result
-
55,115 mil
-
AUTOMATIC
-
ELECTRIC
-
Rear-wheel drive
3TYAX5GN1MT010686 TOYOTA TACOMA 2021 No result
-
AUTOMATIC
-
GAS
-
Rear-wheel drive
-
57,447 mil
-
AUTOMATIC
-
GAS
-
All wheel drive