PA - PITTSBURGH NORTH

WBS43AZ03PCL22487 | 2023 BMW M4 COMPETITION

  • VIN VIN

    WBS43AZ03PCL22487

  • Model Year Model Year

    2023

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M4, including its full copart bid history and auction history. This 2023 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ03PCL22487, COMPETITION trim, BLACK exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AZ03PCL22487 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ03PCL22487 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (PA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 0 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Fuel Fuel : GAS
  • Color Color : BLACK
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : SIDE REAR END
  • Auction Auction : copart
  • Location Location : PA - PITTSBURGH NORTH

Similar Vehicles

Auction: copart
  • 79,539 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 16,638 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 3,174 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 52,038 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 28,211 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 30,567 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv