WBS43AZ03RCP96796 | 2024 BMW M4 COMPETITION XDRIVE
- Iaai
- Lot #: 44187023
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M4, including its full iaai bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ03RCP96796, COMPETITION XDRIVE trim, Green exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AZ03RCP96796 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ03RCP96796 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 4,429 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
4,429 mil
-
Fuel :
Gasoline
-
Color :
Green
-
Keys :
Key Available
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End
-
Auction :
iaai
-
Location :
Los Angeles South
-
Seller :
Mercury Insurance
Similar Vehicles
3N1AB8CVXRY326480 NISSAN SENTRA 2024 No result
-
1 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
JTDBCMFE4RJ019412 TOYOTA COROLLA 2024 No result
-
44,600 mil
-
Automatic
-
Hybrid
-
Front Wheel Drive
2HKRS4H71TH428614 HONDA CR-V 2026 No result
-
387 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
11,330 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
2T3J1RFV1MW158518 TOYOTA RAV4 2021 No result
-
1 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
3N8AP6DA5SL401396 NISSAN KICKS 2025 No result
-
323 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive