WBS43AZ04PCM47840 | 2023 BMW M4 COMPETITION XDRIVE
- Iaai
- Lot #: 41125411
Vehicle Main Features
On this page, you will discover the complete profile of the 2023 BMW M4, including its full iaai bid history and auction history. This 2023 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ04PCM47840, COMPETITION XDRIVE trim, Blue exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AZ04PCM47840 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ04PCM47840 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 1 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
1 mil
-
Fuel :
Gasoline
-
Color :
Blue
-
Keys :
Key Available
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End
-
Auction :
iaai
-
Location :
Long Island
-
Seller :
Geico Insurance
Similar Vehicles
-
40,848 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
-
73,529 mil
-
Automatic
-
Hybrid
-
Front Wheel Drive
-
52,535 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
JTJHZKFA7L2024953 LEXUS RX350 2020 Not sold
-
60,874 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
5TDERKEC0NS089535 TOYOTA SIENNA 2022 Not sold
-
AUTOMATIC
-
HYBRID ENGINE
-
Front-wheel Drive
WA1EAAFY6R2047325 AUDI Q5 2024 $29,450
-
10,811 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive