WBS43AZ04RCP59109 | 2024 BMW M4 COMPETITION XDRIVE
- Iaai
- Lot #: 38862070
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M4, including its full iaai bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ04RCP59109, COMPETITION XDRIVE trim, Orange exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AZ04RCP59109 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ04RCP59109 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (MV-907A-NY) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 2 Apr 2024, and verify the mileage of 5,619 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
5,619 mil
-
Fuel :
Gasoline
-
Color :
Orange
-
Keys :
Key Available
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L I-6 DI, DOHC, VVT, turbo, 503HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End RIGHT SIDE
-
Auction :
iaai
-
Seller :
State Farm Group Insurance
Similar Vehicles
3MW5R7J06N8C26797 BMW 330I 2022 No result
-
23,032 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
8,942 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
5TDKRKEC0MS043964 TOYOTA SIENNA 2021 No result
-
90,124 mil
-
Automatic
-
Hybrid
-
Front Wheel Drive
5YFB4MDE1PP039951 TOYOTA COROLLA 2023 No result
-
18,157 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
YV4102PK3K1482139 VOLVO XC90 2019 No result
-
36,774 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
WAUR2AF21KN053129 AUDI A7 2019 No result
-
40,691 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive