Dream Rides

WBS43AZ04RCP64729 | 2024 BMW M4 COMPETITION XDRIVE

  • VIN VIN

    WBS43AZ04RCP64729

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    15,806 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M4, including its full iaai bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ04RCP64729, COMPETITION XDRIVE trim, Dark Blue exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AZ04RCP64729 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ04RCP64729 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 17 Feb 2025, and verify the mileage of 15,806 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 15,806 mil
  • Fuel Fuel : Gasoline
  • Color Color : Dark Blue
  • Keys Keys : Key Available
  • Body Type Body Type : Coupe
  • Transmission Transmission : Automatic
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 503HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Left Rear SUSPENSION
  • Auction Auction : iaai
  • Location Location : Dream Rides
  • Seller Seller : Geico Insurance

Similar Vehicles

Auction: iaai
  • 102,987 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 68,312 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 525 mil
  • Automatic
  • Hybrid
  • All-Wheel Drive
Auction: iaai
  • 1 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 22,182 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 46,399 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive