WBS43AZ07PCM54670 | 2023 BMW M4 COMPETITION
- Copart
- Lot #: 76988614
Vehicle Main Features
On this page, you will discover the complete profile of the 2023 BMW M4, including its full copart bid history and auction history. This 2023 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ07PCM54670, COMPETITION trim, WHITE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS43AZ07PCM54670 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ07PCM54670 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (MO SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 31 Jan 2025, and verify the mileage of 0 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Fuel :
GAS
-
Color :
WHITE
-
Keys :
NO
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
All wheel drive
-
Damage :
FRONT END REAR END
-
Auction :
copart
-
Location :
MO - ST. LOUIS
Similar Vehicles
-
57,900 mil
-
AUTOMATIC
-
ELECTRIC
-
All wheel drive
-
82,460 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
All wheel drive
-
82,608 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
Front-wheel Drive
-
AUTOMATIC
-
GAS
-
4x4 w/Rear Wheel Drv
-
163,094 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
15,759 mil
-
AUTOMATIC
-
GAS
-
4x4 w/Rear Wheel Drv