FL - MIAMI CENTRAL

WBS43AZ07RCN57722 | 2024 BMW M4 COMPETITION

  • VIN VIN

    WBS43AZ07RCN57722

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    23,639 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M4, including its full copart bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43AZ07RCN57722, COMPETITION trim, GREEN exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43AZ07RCN57722 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43AZ07RCN57722 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (FL CD) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 22 Dec 2025, and verify the mileage of 23,639 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 23,639 mil
  • Fuel Fuel : GAS
  • Color Color : GREEN
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : ALL OVER UNDERCARRIAGE
  • Auction Auction : copart
  • Location Location : FL - MIAMI CENTRAL

Similar Vehicles

Auction: copart
  • 4,106 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 29,785 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 4,667 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 39,615 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 69,538 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 24,345 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive