FL - TAMPA SOUTH

WBS43BA09SCT95227 | 2025 BMW M4 COMPETITION

  • VIN VIN

    WBS43BA09SCT95227

  • Model Year Model Year

    2025

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2025 BMW M4, including its full copart bid history and auction history. This 2025 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS43BA09SCT95227, COMPETITION trim, BLACK exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS43BA09SCT95227 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS43BA09SCT95227 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (FL RB) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 0 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Fuel Fuel : GAS
  • Color Color : BLACK
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : All wheel drive
  • Damage Damage : FRONT END SIDE
  • Auction Auction : copart
  • Location Location : FL - TAMPA SOUTH

Similar Vehicles

Auction: copart
  • 10,859 mil
  • AUTOMATIC
  • HYBRID ENGINE
  • Front-wheel Drive
Auction: copart
  • 33,133 mil
  • AUTOMATIC
  • ELECTRIC
  • All wheel drive
Auction: copart
  • 101,202 mil
  • AUTOMATIC
  • GAS
  • Rear-wheel drive
Auction: copart
  • 11,168 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 4,566 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • 858 mil
  • AUTOMATIC
  • HYBRID ENGINE
  • 4x4 w/Rear Wheel Drv