KY - LOUISVILLE

WBS4Y9C51KAG67433 | 2019 BMW M4

  • VIN VIN

    WBS4Y9C51KAG67433

  • Model Year Model Year

    2019

  • Total Drove Total Drove

    18,638 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2019 BMW M4, including its full copart bid history and auction history. This 2019 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS4Y9C51KAG67433, trim, YELLOW exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and Rear-wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS4Y9C51KAG67433 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS4Y9C51KAG67433 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (KY BS) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 6 Mar 2025, and verify the mileage of 18,638 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 18,638 mil
  • Fuel Fuel : GAS
  • Color Color : YELLOW
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : Rear-wheel drive
  • Damage Damage : FRONT END
  • Auction Auction : copart
  • Location Location : KY - LOUISVILLE

Similar Vehicles

Auction: copart
  • 1,932 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 12,069 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 26,070 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 144,868 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 11,761 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 32,755 mil
  • AUTOMATIC
  • GAS
  • All wheel drive