Greensboro

WBS53AY01RFT48402 | 2024 BMW M3

  • VIN VIN

    WBS53AY01RFT48402

  • Model Year Model Year

    2024

  • Total Drove Total Drove

    5,685 mil

  • Transmission Transmission

    Manual

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2024 BMW M3, including its full iaai bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS53AY01RFT48402, trim, Green exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 473HP engine running on Gasoline. With Manual transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS53AY01RFT48402 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS53AY01RFT48402 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 5,685 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 5,685 mil
  • Fuel Fuel : Gasoline
  • Color Color : Green
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Manual
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 473HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : Front End RIGHT REAR
  • Auction Auction : iaai
  • Location Location : Greensboro
  • Seller Seller : Erie Insurance Group

Similar Vehicles

Auction: iaai
  • 24,509 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 79,287 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 60,985 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 41,336 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 10,332 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 14,533 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive