WBS53AY06RFS53348 | 2024 BMW M3
- Copart
- Lot #: 57693466
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M3, including its full copart bid history and auction history. This 2024 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS53AY06RFS53348, trim, BLACK exterior, and a powerful 3.0L 6 engine running on GAS. With MANUAL transmission and REAR WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS53AY06RFS53348 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS53AY06RFS53348 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (NY FS) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 28 Sep 2026, and verify the mileage of 21,476 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
21,476 mil
-
Fuel :
GAS
-
Color :
BLACK
-
Keys :
YES
-
Body Type :
SEDAN
-
Transmission :
MANUAL
-
Engine :
3.0L 6
-
Drive line :
REAR WHEEL DRIVE
-
Damage :
WATER/FLOOD
-
Auction :
copart
-
Location :
NY - LONG ISLAND
Similar Vehicles
2HKRS4H78TH470598 HONDA CRV 2026 Upcoming
-
11,546 mil
-
AUTOMATIC
5FNYF6H36NB059324 HONDA PILOT 2022 Upcoming
-
33,977 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
2HGFE2F57PH509407 HONDA CIVIC 2023 Upcoming
-
64,564 mil
-
AUTOMATIC
-
GAS
-
FRONT WHEEL DRIVE
3MW89FF01P8D61060 BMW 3 SERIES 2023 Upcoming
-
18,504 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
-
79,214 mil
-
AUTOMATIC
-
GAS
-
FRONT WHEEL DRIVE
-
58,322 mil
-
AUTOMATIC
-
GAS
-
FRONT WHEEL DRIVE