Albany

WBS53AY09PFP11722 | 2023 BMW M3

  • VIN VIN

    WBS53AY09PFP11722

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    23,671 mil

  • Transmission Transmission

    Manual

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M3, including its full iaai bid history and auction history. This 2023 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS53AY09PFP11722, trim, Red exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, premium , 473HP engine running on Gasoline. With Manual transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS53AY09PFP11722 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS53AY09PFP11722 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 23,671 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 23,671 mil
  • Fuel Fuel : Gasoline
  • Color Color : Red
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Manual
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, premium , 473HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : Right Front
  • Auction Auction : iaai
  • Location Location : Albany
  • Seller Seller : Progressive Casualty Insurance

Similar Vehicles

Auction: iaai
  • 1 mil
  • Automatic
  • Electric
  • Rear Wheel Drive
Auction: iaai
  • 43,361 mil
  • Automatic
  • Electric
  • All-Wheel Drive
Auction: iaai
  • 83,417 mil
  • Automatic
  • Flexible Fuel
  • Rear Wheel Drive
Auction: iaai
  • 76,155 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 48,238 mil
  • Automatic
  • Gasoline
  • Rear Wheel Drive
Auction: iaai
  • 152,028 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive